CAPSCU Technical Assistance

  Year 2004
1-     Cathodic protection studies for production facilities at  Ras-Shukair - GUPCO

2-     Design of Cathodic Protection for a Pipeline –PETROJET

3-     Failure Analysis Investigation for two Gas Cylinders –GASTEC

4-     Failure Analysis Investigation of Valve Rupture at BED-3 Field - BAPETCO

5-     Failure analysis of steel wire ropes- GUPCO

6-     Assessment of Designs and Failure Analysis Investigation of Cement Silos -MICAR

7-     Inspection and Assessment of Steel Structures- ARCOSTEEL

8-     Investigations of Root Cause of Gear Failures – GUPCO

9-     Root Cause Analysis of Spanner Failure – GUPCO

10- Design assessment of an Oil Pipeline – MOSTROD

11- Design assessment of a Solar Pipeline – MOSTROD

12- Investigations of a Pipeline material – GUPCO

13- Design Appraisal and Failure Analysis Investigation of a Raw Mill- DryMix

14-  Design of Support System for Gas Piping- Nile Valley Gas Co.

15-  Failure Analysis & Material Investigation for drilling pipes and ESP – Qarun Petroleum Co.

16- Failure Analysis of Gearboxes for a conveying system VENUS Co.

17- Material investigation of stainless steel bands – GUPCO

18- Investigation of root cause of explosion in acetylene piping system – Ministry of Agriculture laboratories

19- Failure analysis of ball valves – Qarun Oil Co.

20- Design appraisal of gas compressor gear box – BAPETCO

21- Corrosion control studies at Zaafarana field- GEMSA

22- Studies towards repair and rebuilding GEMSA Jetty

23-  Failure analysis of Gas Valve bonnet bolts – Petrobel 

24-  Failure Analysis & Material Investigation for drilling pipes and ESP – Qarun Petroleum Co.

25-  Investigation of a steam turbine rupture – EMISAL

26- Assessment of Pressure Carrying Capacities of 35 Risers in the Mediterranean fields- Petrobel

27- Failure Analysis of Tubing Threads – QARUN

28- Investigation of Vibration in a Motor- Pump system – QARUN

29- Assessment of Hardness distribution at pipe welds operating in H2S rich environment – GUPCO

30- Assessment of Fitness for service of platform structure and piping – GUPCO

31-  Studies of Communication network at Suez Oil Co. – Soko

32- Failure analysis of a Waukosha Gas Engine – GUPCO Gas complex

    Year 2003

    CAPSCU SAMPLE TECHNICAL REPORTS  

  • Technology Development of Aluminum Reduction Cells: Performance Evaluation. February 2003
  • Design Calculation and Compression Test on Uprights for Storage System for Link Misr. February 2003
  • Corrosion Monitoring & Control Systems at Zaafarana Production Facilities. March 2003
  • Investigation of Natural Gas Piping at El-Ezz Flat Rolled Products, Suez. April 2003
  • Failure Analysis of Production Tubing of Q-21 Well Qarun Petroleum Company. May 2003
  • Welding Procedure Specifications (WP) and Procedure Qualification Records (PQR) for The Electrical Cable Spooling Unit Structure. May 2003
  • Interim Technical Report on Corrosion Failure Analysis WTS-10 Cooling Water Pipes ANSDK. June 2003
  • Failure Analysis of Fractured Cover Studs of the 8" Check Valve at West-Achen, GUPCO. June 2003
  • Experimental Study on Adhesive Tapes used for Electrical Insulation. June 2003
  • Environmental Audit and Assistance in Preparing Technical Specifications for Egyptian Petrochemical Company, Amreya, Alexandria. June 2003
  • Failure of Heat Resisting Steel Cast Tubes, Alexandria National Iron /7 Steel Company. June 2003
  • "Towards Egyptian Standards in the Field of Telecommunication Technology and Equipment", Egyptian Organization for Standardization and Quality Control. July 2003
  • "Towards Egyptian Standards in the Field of Information Technology", Egyptian Organization for Standardization and Quality Control. July 2003

Year 2002

    CAPSCU SAMPLE TECHNICAL REPORTS

  • Assessment of project proposal for improving occupational environment in the textile industry for EL-Hesni Dyers and Finishers in 10th of Ramadan City. March 2002
  • Investigation of Gearbox and Failure Diagnosis of its Oil Thrower, Badr Petroleum Company. April 2002
  • Failure Analysis of Ball Valves for 6" Oil Pipeline, Qarun Petroleum Company. May 2002
  • Assessment of Battery Responsibility for Short-circuits in Medium-Voltage Switchboard at Embaba Water Treatment Plant. May 2002
  • Assessment of Project Proposal for Improving occupational environment in the textile industry for EL-Hesni Dyers and Finishers in 10th of Ramadan City. May 2002
  • Technology Development of Aluminum Reduction Cells: Performance Evaluation. July 2002
  • Environmental Audit and Assistance in Preparing Technical Specifications for Egyptian Petrochemical Company, Amreya, Alexandria. Septemper 2002
  • Failure Analysis of Steam Turbine-B and Associated Power House, the Egyptian Minerals and Salts Company Emisal. October 2002
  • Analysis of the Damage of the 10" and 4" Risers Accomodated at Wakar Platform. October 2002.
  • Environmental Audit and Assistance in Preparing Technical Specifications for Egyptian Petrochemical Company, Amreya, Alexandria. August 2002
  • Failure Analysis of Production Tubing of Q-21 Well, Qarun Petroleum Company. November 2002
  • Technical Evaluation of AKW & ProIng Offers for the Supply of Gold Ore Dressing, Leaching and Electro-Winning. November 2002
  • Technical Assessment of Water-Cooled Vs Air-Cooled Systems in Air-Conditioned Commercial Buildings Applications in Egypt. December 2002
Year 2001

    CAPSCU SAMPLE TECHNICAL REPORTS 

  • Test Results on Samples of DN 600 Ductile Iron and Fittings. February 2001
  • Investigation and Failure Diagnosis of Gear Reducers on the Bucket Elevator Conveyors. February 2001
  • Investigation and Failure Diagnosis of Gear Reducers on the Bucket Elevator Conveyors. March 2001
  • Failure Analysis of a Corroded Gas Separator End of Well #SWQ-4 at Qarun Petroleum Company. April 2001
  • Failure Analysis Report Production Tubing: Well Q-18, Qarun Petroleum Company. May 2001
  • Determination of Active Bending Moment by means of Observed Curvature of the Nest Bolt of Soderburg Reduction Cell. July 2001
  • Ethyl Alcohol Production Plant at International Company for Supportive Medical Industries, Volume (1): Process Design. June 2001
  • Ethyl Alcohol Production Plant at International Company for Supportive Medical Industries, Volume (2): Process Functional and Mechanical Design. July 2001
  • Comments on White Young Green and EMISAL Reports on Upgrading the Sodium Sulphate Plant Capacity. August 2001
  • A Technical Evaluation on Steam Boilers at Caltex Blending Co. (Calblec). August 2001
  • A Technical Assessment of Explosion of an Acetylene Pipeline. August 2001
  • A Technical Evaluation of Mechanical and Metallurgical Properties of Stainless Steel Band Specimen. August 2001
  • Design Calculation and Compression Test on Upright for Storage System for Egypt Air. August 2001
  • Comments on U.S. Filter Report on Upgrading the Sodium Sulphate Plant Capacity. October 2001
  • A Technical Assessment on "Why a Dynamic Hip Screw (DHS) with the Barrel Plate during an Intertrochanteric Fermural Fracture Surgery". November 2001